NEW Indoor Swim School

Coming to Frederick next to the Frederick Airport is our new swim facility. Once finished, it will feature 3 lap lanes (25 yds/ 75 ft), a 7 feet deep area, extended steps, warm water (and air), parent viewing area, party room, private change rooms and off street parking. The facility is designed to grow with your family and we have listened to the wants/ needs. More programming info will come soon. 

Bookings for swim lessons/ parties/ summer camp/ etc will occur once we are confident on an opening date. 

Goal: Open end of May/ June 2025.

We have launched a Kickstarter campaign with some pretty awesome and exclusive rewards! Check it out here:

April 2nd: The shell for the pool is in! About 28 days later, the final layer (plaster) goes in. Up next is pool deck, pool edge, equipment room and pool plumbing. The pool area HVAC/ dehumidifier unit is now in the hands of the installer and will be on site tomorrow (the longest lead time piece of equipment/ ordered in Dec).

The onland side is moving along. Wall close in inspection passed, they are almost done insulating and are putting drywall up. Hall lights are going in. We finally got the electric meter (gas meter already installed). They are moving along really nicely!


More pictures of progress can be found at https://facebook.com/serenityswimming.